Monday, October 26, 2015

Things are happening!

Stopped by today to turn in the rest of our 5% down and check out a few Calvert's that are closing soon. We wanted to see what it looked like with some of the options we selected, like the luxury master, no morning and room and flipped floorplan. I'm super excited about the master upgrade. The bathroom is awesome and the tray ceiling is surprisingly grand. They put the molding around the bottom of the tray with an outlet so lights could be installed to light up the tray. We think that could be a cool idea, especially with using Philip's Hue, but it could get pricy. The other thing I was curious about was how the double shower head in the master shower was dealt with. There are separate valves for each shower head. I think we're going to install a hand shower for the other side. Sorry there are no pics, I got so excited to see I totally forgot (doink!)

We found out we should know our dig date tomorrow and will be setting up our pre-construction meeting! FINALLY!

There was even a little bit of progress on our lot. It was staked out and there are utility meters!



No comments:

Post a Comment